Laserfiche WebLink
To: Jared Ebert <br />Date: February 14, 2018 <br />Page 20 <br />NOVEMBER 29, 2017 ADEQUACY 2, RESPONSES <br />RULE 6.4.3 EXHIBIT C — PRE-MINING AND MINING PLAN MAP(S) <br />OF AFFECTED LANDS <br />Comment 1a <br />1. Please update the Exhibit C maps to depict the Taylor and Gill Ditch and the Little <br />Cache La Poudre lateral ditch. Please show the name of the owner of the ditch and <br />lateral. <br />Response 1a <br />The Exhibit C (Attachment 1) maps have been updated to show the Taylor and Gill Ditch <br />and the Little Cache la Poudre lateral ditch along with the names of the owners. <br />Comment lb <br />1. The Exhibit C Sheet 1 map does not clearly show who owns the Little Cache La <br />Poudre Lateral Ditch. Please revise the map to clearly indicate the owner of the <br />structure. IfLRM owns the structure please indicate this. <br />Response lb <br />LRM owns the Little Cache la Poudre lateral ditch. The Exhibit C Sheet 1 map has been <br />updated to show that LRM owns the Little Cache la Poudre lateral ditch. Exhibit C is <br />included as Attachment 4. <br />RULE 6.4.4 EXHIBIT D — PRE-MINING AND RULE 6.4.5, EXHIBIT <br />E — RECLAMATION PLAN <br />Comment 2a <br />2. The mining plan and reclamation plan does not appear to take into account the <br />location of the Taylor and Gill Ditch and the lateral ditch. Please revise the mining <br />and reclamation plan as necessary to account for these structures. Please indicate <br />how these structure will be protected from damage during the mining operation. <br />Response 2a <br />The Exhibit C (Attachment 1) maps have been updated to show the Taylor and Gill Ditch <br />and the Little Cache la Poudre lateral ditch. The ditches will be protected from damage <br />during the mining operations by a 50-foot offset between the highwall and the structure. <br />See comments previously made in this letter for more details. <br />Response to DRMS Adequacy Review 3 comments T E .EST O