Laserfiche WebLink
• Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> January 2018 Monthly Report <br /> Page 3 <br /> Table 2—January 2018 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P10 1/30/18 57.56 58.30 0.74 <br /> P11 1/30/18 41.39 41.80 0.41 <br /> P12 1/30/18 41.68 41.71 0.03 <br /> P13 1/30/18 41.05 41.34 0.29 <br /> P14 1/30/18 41.22 41.24 0.02 <br /> P15 1/30/18 40.86 41.10 0.24 <br /> Table 3 below provides the calendar year 2018 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management1/30/18 <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments,please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr. Larry Fiske at(303) 837-5676. <br /> incerely, <br /> 00 <br /> J lio F. Madrid <br /> S . Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />