My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-13_REPORT - M1988112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1988112
>
2018-02-13_REPORT - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 9:57:38 AM
Creation date
2/15/2018 2:47:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
2/13/2018
Doc Name Note
January 2018 Monthly Report
Doc Name
Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ls-1w <br /> rim <br /> BATTLE MOUNTAIN RESOURCES, INC. <br /> February 8, 2018 RECEIVED <br /> I/FEB 13 2018 <br /> DMSION OF RECLAMATION <br /> MINING AND SAFETY <br /> Mr.Lucas J.West <br /> State of Colorado <br /> Division of Reclamation,Mining and Safety <br /> 1313 Sherman Street,Room 215 <br /> Denver, CO 80203 <br /> Re: Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> January 2018 Monthly Report i7 <br /> Dear Mr.Lucas: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br /> San Luis Project for the month of January 2018. <br /> Surface and ground water monitoring and analysis were completed for all required sites during the month <br /> per the terms and conditions of the TR-32 Quality Assurance and Quality Control(QA/QC)plan. <br /> Vacuum on the tailing lysimeters was verified on January 30th, no water was present for sampling and <br /> subsequent analysis. <br /> Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br /> Pit monitoring wells on January 301. The January tailing impoundment piezometer measurements <br /> identified these installations were either dry or contained less than 12 inches of water as illustrated in <br /> Table 2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br /> monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR-32 <br /> QA/QC plan. <br /> The leak detection system was measured on January 30t.A total of 880 gallons of water was excavated <br /> from the leak detection system yielding a monthly average of 27.5 gpad.The tailings pond under-drain <br /> measured 38 gpm. <br /> During the month of January,the West Pit water treatment plant operated efficiently discharging a total of <br /> 7,476,400 gallons(22.95 acre-feet)of water to Rito Seco Creek and a total of 463,200 gallons(1.42 acre- <br /> feet)of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito Seco <br /> Creek remained dry during the month. <br /> P.O.Box 310 • San Luis,Colorado 81152-0310 • (719)379-0798 • Fax(719)379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.