My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-13_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2018-02-13_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 9:57:36 AM
Creation date
2/15/2018 2:46:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/13/2018
Doc Name Note
Adequacy Review Response
Doc Name
Adequacy Review Response
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR28
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Facility Certification <br /> Henderson Mill — Permit No. M-1977-342 <br /> Technical Revision 28 <br /> Ute Park Extraction Wellfield Project — Phase Ill <br /> The Ute Park Extraction Wellfield Project—Phase III was approved as Technical Revision No. 28 to Mill <br /> Permit No. M-1977-342 on June 14, 2017. This project is located at Climax Molybdenum Company's <br /> Henderson Mill in Grand County. The project involved the construction of two extraction wells, one <br /> monitoring well, and support infrastructure, including pipeline, vault, electrical power line, and <br /> instrumentation at locations down gradient from 1 Dam at the Mill. <br /> The Henderson Mill and contractors have substantially completed the construction of the project and it <br /> has been tested and determined to be functional. The systems were designed and installed to meet <br /> applicable electrical codes and Henderson design requirements. <br /> Modifications to the initial design have been reflected in the record drawings for MLGW-26, MLEX-4 and <br /> MLEX-5. <br /> FMI EIS group was responsible for the design,coordination, and implementation of the electrical <br /> systems. The project was completed in general conformance with the approved design as submitted to <br /> the Division, of Reclamation, Mining, and Safety. The statement is based in part on information provided <br /> by others. <br /> kv\AUlAti,/_________, 2/ 1/201 <br /> Brandon Beggs Date <br /> Henderson Mill <br />
The URL can be used to link to this page
Your browser does not support the video tag.