Laserfiche WebLink
Environmental Protection Facility Certification <br /> Henderson Mill — Permit No. M-1977-342 <br /> Technical Revision 28 <br /> Ute Park Extraction Wellfield Project — Phase Ill <br /> The Ute Park Extraction Wellfield Project—Phase III was approved as Technical Revision No. 28 to Mill <br /> Permit No. M-1977-342 on June 14, 2017. This project is located at Climax Molybdenum Company's <br /> Henderson Mill in Grand County. The project involved the construction of two extraction wells, one <br /> monitoring well, and support infrastructure, including pipeline, vault, electrical power line, and <br /> instrumentation at locations down gradient from 1 Dam at the Mill. <br /> The Henderson Mill and contractors have substantially completed the construction of the project and it <br /> has been tested and determined to be functional. The systems were designed and installed to meet <br /> applicable electrical codes and Henderson design requirements. <br /> Modifications to the initial design have been reflected in the record drawings for MLGW-26, MLEX-4 and <br /> MLEX-5. <br /> FMI EIS group was responsible for the design,coordination, and implementation of the electrical <br /> systems. The project was completed in general conformance with the approved design as submitted to <br /> the Division, of Reclamation, Mining, and Safety. The statement is based in part on information provided <br /> by others. <br /> kv\AUlAti,/_________, 2/ 1/201 <br /> Brandon Beggs Date <br /> Henderson Mill <br />