Laserfiche WebLink
,<C�, <br />NEWMONT <br />February 15, 2018 <br />HAND DELIVERED <br />Mr. Timothy Cazler, P.E. <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Newmont Mining Corporation <br />Cripple Creek & Victor Cotd Aening Company <br />100 N 3" St <br />P.O. Box 181 <br />Victor, CO 8D86C <br />wuuw.nmymaet.com <br />RECEIVED <br />✓FEB 15 2018 <br />DMSION OF RECIAMATIM <br />MININGAND SAFEfy <br />Re: Criaale Creek_& Victor Minino. Co.. Cresson Prolect. MAND-244- ReviAw <br />Dear Mr. Cazier: <br />On February 14, 2018, Newmont Mining Company's Cripple Creek and Victor Gold Mining <br />Company (CC&V) received the Division of Reclamation, Mining and Safety's (DRMS) review <br />comments for Concentrate Shipping Building Record of Construction Report (1R-89). Below are <br />DRMS's comments in italics followed by CC&V's response in bold. Documentation required to <br />support our responses is included in the attachments. <br />1. Certlfvina Enginegrr: NewFlelds Record of Construction Report, page 3, section 1.2 <br />states the certffying engineer is NewFields, Jay -Janney -Moose. If this is in fact the case, <br />the Division would expect the Record Drawings In Appendix C.1 to be stamped and <br />signed by Mr. Janney 4*ore. However, the Record Drawings are not stamped or <br />signed by Mr. Janney -Moore or any other engineer. Accompanying the Record Drawings <br />Is Appendix C 2, AMEC's Concentrate Processing Phase 7 As -Built Letter suggesting the <br />Record drawings have been stamped end approved by proxy. The owner's designated <br />certifying engineer must stamp and sign the record drawings pursuant to Rules <br />B Z 1(2)(b) and 7.3.2(2). <br />Response 1. Certifying Engineer. Newflelds Record of Construction Report states <br />correctly that the certifying engineer is Jay Janney -Moore. <br />a. Both AMEC Foster Wheeler (Wood) and Newfields were Involved and <br />familiar with the project. AMEC Foster Wheeler was requested to update <br />the drawings identified in Appendix C.2 due to resource availability as a <br />