Laserfiche WebLink
TABLE 20-1 <br />POSTMINING LANDFORM MASS BALANCE <br />Postmining Material Volume Calculations <br />Postmining Spoil Material Calculated: <br />Postmining Spoil Material Volume (Internal) 9,967,2081cy 31,502,979 cy <br />Postmining Spoil Material Volume (External) 186,012 cy <br />Total Postmining Spoil Volume 10,153,220 cy 31,502,979 cy <br />Postmining Overburden Material Excavated <br />Premining Total Pit Spoil Volume 11,062,695 cy 30,858,801 cy <br />Postmining Overburden Material (External) 99,612 cy <br />Total Overburden Material Excavated (Swelled) 11,162,577 cy 30,858,801 cy <br />Postmining Material Volume Comparison <br />Total Postmining Spoil Volume 10,153,220 cy 31,502,979 cy <br />Total Overburden Material Excavated 11,162,577 cy 30,858,801 cy <br />Volume Difference 1,009,357 cy 644,178 cy <br />4 Revised 02/99 <br />Area 1 <br />Area 2 <br />Premining Pit Material Volume Calculations <br />Premining Material Volume <br />12,404,306 <br />bcy <br />31,738,823 <br />bcy <br />Virgin Overburden Material Volume <br />9,623,200 <br />bcy <br />27,087,354 <br />bcy <br />Total In-place Coal Volume <br />2,781,106 <br />bcy <br />4,651,469 <br />bcy <br />Recoverable Coal Volume <br />2,526,900 <br />bcy <br />4,186,322 <br />bcy <br />Non -recovered Coal and Parting Material Volume <br />254,206 <br />bcy <br />456,147 <br />bcy <br />Premining Overburden Volume <br />9,877,406 <br />bcy <br />27,552,501 <br />bcy <br />Total Pit Spoil Volume <br />11,062,694 <br />lcy <br />30,858,801 <br />lcy <br />Premining Material Mass Volume: <br />Total Pit Spoil Volume <br />11,062,694 <br />lcy <br />30,858,801 <br />lcy <br />Total Premining Material Volume <br />12,404,306 <br />bcy <br />31,738,823 <br />bcy <br />Postmining Material Volume Calculations <br />Postmining Spoil Material Calculated: <br />Postmining Spoil Material Volume (Internal) 9,967,2081cy 31,502,979 cy <br />Postmining Spoil Material Volume (External) 186,012 cy <br />Total Postmining Spoil Volume 10,153,220 cy 31,502,979 cy <br />Postmining Overburden Material Excavated <br />Premining Total Pit Spoil Volume 11,062,695 cy 30,858,801 cy <br />Postmining Overburden Material (External) 99,612 cy <br />Total Overburden Material Excavated (Swelled) 11,162,577 cy 30,858,801 cy <br />Postmining Material Volume Comparison <br />Total Postmining Spoil Volume 10,153,220 cy 31,502,979 cy <br />Total Overburden Material Excavated 11,162,577 cy 30,858,801 cy <br />Volume Difference 1,009,357 cy 644,178 cy <br />4 Revised 02/99 <br />