Laserfiche WebLink
Bill Bear <br />Page 2 <br />2/14/2018 <br />On September 3, 2016, SL -1 was issued. SL -1 was a partial phase I, II and III bond release. <br />82.93 acres were phase I released, 45.33 acres were phase II released and 4.1 acres were phase <br />III released. The Proposed decision for SL -2 was December 30, 2016. SL -2 phase I released <br />12.27 acres of land. A total of 95.2 acres of land was phase I released in 2016. <br />The 2017 ARR reported that 31.5 acres of land were seeded greater than 10 years ago. The 2016 <br />ARR reported only 7.2 acres on the chart. Please clarify why 24.3 acres where added to the <br />total in 2017. The information in the 2017 report indicates that 0.0 acres were reported to <br />be reseeded in the year 2007, which should have not added any acreage to the "Greater <br />than 10 years" field on the chart. <br />The Division has no further comments. This concludes the review of the 2017 Annual <br />Reclamation Report for the Bowie No. 2 Mine. If you have any questions, please contact me at <br />(303)-866-3567 x8144. <br />Sincerely, <br />Clayton Wein <br />Environmental Protection Specialist <br />clayton.wein@state.co.us <br />555 Street Address, Room 555, Denver, Co 55555-5555 P 555.555.5555 <br />