Laserfiche WebLink
Clayton Wein -7- February12, 2018 <br />2 Construction of Terror Creek access road re -disturbed 0.5 acres during 2010. Reclaimed acreage reduced from 0.8 to 0.3. <br />3 GVB-13E and 13F redisturbed BRL-08-03 drill pad and Pond 7 road. Reclaimed acreage reduced by 0.9 acres. <br />Same site as: GVB-WD1-B (TR -21 80) <br />0.5 <br />2008 <br />GVB-B3-B aka - B3-D(MR-55 144) <br />0.0 <br />Same site as: GVB-WD1-A (TR -21 78) <br />0.5 <br />2008 <br />GVB-4A (MR -67 155) <br />0.5 <br />2008 <br />GVB-5A (MR -67 155) <br />0.5 <br />2008 <br />GVB-6B (MR -65 153) <br />0.5 <br />2008 <br />GVB-6C (MR -65 153) <br />0.5 <br />2008 <br />GVB-6D (MR -78 161) <br />0.5 <br />2008 <br />GVB-6E (MR -78 162) <br />0.5 <br />2008 <br />One West Ridge Road Segments (TR -41 )2 <br />0.3 <br />2009 <br />No backfill or grading in 2009 <br />0.0 <br />2010 <br />Drill Pad DH -2010-2 <br />0.5 <br />2010 <br />One West Ridge Road Segment (TR -41) <br />0.3 <br />2011 <br />Terror Creek Shaft Pad (TR -47 & 48) <br />1.2 <br />2011 <br />GVB 8A & 9D (TR -52 176) <br />1.0 <br />2011 <br />GVB 8 -TG (MR -105 194) <br />1.0 <br />2011 <br />Dove Gulch east road (TR -52 184) <br />0.9 <br />2011 <br />HC -08-01 (TR53 186) <br />0.5 <br />2011 <br />GVB-7A (MR -78 164) <br />0.5 <br />2011 <br />FG E Extension (MR -78 170) <br />0.3 <br />2011 <br />GVB-7B (MR -78 165) <br />0.5 <br />2011 <br />FG N Ext (MR -78 171) <br />0.1 <br />2011 <br />GVB-7D (MR -78 167) <br />0.5 <br />2011 <br />BRL-08-03 (TR -49 B1 198) <br />0.5 <br />2011 <br />Pond 7 Road (TR49 B1 201) <br />0.4 <br />2011 <br />BRL-08-04 (TR -49 B1 199) <br />0.5 <br />2011 <br />DH -69 Road (TR49 B1 202) <br />0.7 <br />2011 <br />Road NR E Branch (MR -78 168) <br />0.2 <br />2011 <br />Road NR WNW Ext (MR -78 172) <br />0.3 <br />2011 <br />GVB D9 -B (TR -23 092) <br />0.5 <br />2011 <br />GVB-10E & 1 OU -1 (TR -52 180) <br />1.0 <br />2011 <br />Plantation Extension (TR -52 183) partial <br />0.1 <br />2011 <br />GVB-DS-C (TR -20 61) <br />0.5 <br />2011 <br />Freeman Gulch North Extension (TR -20 23) <br />0.2 <br />2011 <br />GVB-D6-C (TR -20 62) <br />0.5 <br />2011 <br />Freeman Gulch North Extension (TR -20 24) <br />0.2 <br />2011 <br />GVB D3 -C (TR17 57) <br />0.5 <br />2011 <br />Freeman Gulch Northeast (TR -20 28) <br />0.4 <br />2011 <br />Freeman Gulch Northeast (TR -21 76) <br />0.7 <br />2012 <br />BRL-08-03 (TR -49 B1 198)3 <br />-0.5 <br />2012 <br />Pond 7 Road (TR49 B1 201 )3 <br />-0.4 <br />2012 <br />GVB-9C (TR52 174) <br />1.0 <br />2012 <br />GVB-10D-1 & 1OD-2 (TR -52 177) <br />1.0 <br />2012 <br />GVB-9E & 8B (TR -52 179) <br />1.0 <br />2012 <br />GVB-B10A (MR -125 205) <br />1.0 <br />2012 <br />GVB-B10B (MR -125 206) <br />1.0 <br />2012 <br />BRL-2012-1 (TR -73 231) <br />1.0 <br />2 Construction of Terror Creek access road re -disturbed 0.5 acres during 2010. Reclaimed acreage reduced from 0.8 to 0.3. <br />3 GVB-13E and 13F redisturbed BRL-08-03 drill pad and Pond 7 road. Reclaimed acreage reduced by 0.9 acres. <br />