My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-13_INSPECTION - C1981044
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981044
>
2018-02-13_INSPECTION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 9:04:51 AM
Creation date
2/14/2018 8:42:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Inspection
Doc Date
2/13/2018
Doc Name
Inspection Report
From
DRMS
To
Moffoat County Mining, LLC
Inspection Date
2/8/2018
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 8, 2018 C-1981-044/Williams Fork Mines TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 6 <br /> <br />control along the river where disturbance was created removing conveyor tubes. A berm is currently present to <br />prevent material from going into or near the river while conveyor support structures are being removed. <br /> <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br /> The silo was still standing at the time of inspection, and a plan is in place to continue with demolition. <br />Facility structure foundations are being removed to 4 ft. below approximate original contour. The tunnel under the <br />coal stack tube has been removed. The railroad bridge is in process of removal. The rail scale was being <br />removed. Coal is being removed from the site and going to Foidel Creek Mine. <br /> <br />Mine areas at the Utah tract and the Williams Fork strip pit were not observed due to mud/winter conditions. <br /> <br /> <br />DOCUMENTS RECEIVED <br />Refuse pile inspections, pond inspections, PE signed annual impoundment inspections <br /> <br />OTHER (SPECIFY) <br />Current permitting actions/ due dates <br /> <br />RN7: submitted 2/8/2018, found complete 2/12/2018, adequacy due from the Division by 4/13/2018, decision date <br />6/12/2018 <br /> <br />ARR due: 2/15/2018 received: 2/2/2018 <br />AHR due: 3/30/2018 <br /> <br /> <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />
The URL can be used to link to this page
Your browser does not support the video tag.