My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-13_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2018-02-13_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 9:03:51 AM
Creation date
2/14/2018 8:28:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
2/13/2018
Doc Name
Inspection Report
From
DRMS
To
Mountain Coal Company
Inspection Date
2/5/2018
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 5, 2018 C-1980-007/West Elk Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 5 <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br /> Access to the RPEE was not possible. Processing waste was still temporarily stockpiled on the RPE. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance 4.03.1(5) and <br />(6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br /> Access to the roads and pads in the mountains south of the facilities area was challenging. Warmer <br />daytime temperatures have caused some rising of stream flows and thawing of the road surfaces causing them to <br />be soft. Due to these poor ground conditions, the Contractors were not working and had left their equipment on <br />site until the ground freezes enough to safely move it. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> The Sylvester Gulch facilities were inspected, with no issues noted. <br />Contractors were still working on the installation of the new water tank. <br /> <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br />
The URL can be used to link to this page
Your browser does not support the video tag.