Laserfiche WebLink
43 - <br />REHABILITATE, OR REPLACE THE WATER SUPPLY. BRL MUST SUBMIT A <br />COPY OF A COURT APPROVED ALTERNATIVE WATER SUPPLY OR COURT <br />APPROVED SOURCES OF AUGMENTATION WATER THAT COULD BE <br />DEVELOPED TO REPLACE THE EXISTING SOURCES. THE ALTERNATE OR <br />SUBSTITUTED WATER SHALL BE OF A QUALITY AND QUANTITY SO AS TO <br />MEET THE REQUIREMENTS FOR WHICH THE WATER HAS NORMALLY BEEN <br />USED. <br />WITHIN SIXTY DAYS FOLLOWING THE COLLECTION OF A YEAR OF VALID <br />BASELINE DATA FROM THE TWO DOWN -GRADIENT MONITORING WELLS <br />TO BE DRILLED IN 2015 (2015-113 AND 2015 -ISS), BRL MUST SUBMIT A <br />TECHNICAL REVISION TO UPDATE THE PROBABLE HYDROLOGIC <br />CONSEQUENCES SECTION OF THE PERMIT TO ESTABLISH THOSE WELLS AS <br />GROUNDWATER POINTS OF COMPLIANCE, IN ACCORDANCE WITH RULES <br />2.05.6(3)(B)(III) AND (IV). <br />44- PRIOR TO INITIATING ANY LONGWALL MINING IN THE SPRUCE STOMP <br />LEASE AREA (COC -75916), BRL MUST OBTAIN APPROVAL FOR A PLAN TO <br />MANAGE REFUSE GENERATED AS A RESULT OF MINING ACTIVITIES IN THE <br />SPRUCE STOMP LEASE AREA AND ALL CURRENTLY APPROVED COAL <br />MINING ACTIVITIES. THIS RESTRICTION WILL NOT PRECLUDE <br />DEVELOPMENT MINING ACTIVITIES IN THE SPRUCE STOMP LEASE AREA <br />CONSTRUCTED WITH CONTINUOUS MINING EQUIPMENT. PROPOSED <br />MANAGEMENT PLANS MUST BE PREPARED IN ACCORDANCE WITH RULES <br />2.05.3(8),4. 10, AND 4.11 AND BE BASED ON CURRENT AND PREDICTED RATES <br />OF PRODUCTION AND REFUSE GENERATION AND INCLUDE REFUSE THAT <br />WILL BE GENERATED FROM ALL CURRENTLY APPROVED MINING PLANS. <br />ACCEPTED AND AGREED: <br />By 1f1,,07W&W 4ih� C'- At <br />Operator " 'rrtle <br />DIVISION OF RECLAMATION, MINING & SAFETY <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />Division Director <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />C -RN -18 <br />