Laserfiche WebLink
Mobilization Worksheet Cont’d Task # 06A Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one-way travel distance: 7.00 miles <br />Average Travel Speed: 45.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig: $7,668.49 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $25.38 <br /> <br />Transportation Cycle Time: <br /> Non- <br />Roadable <br />Equipment <br /> <br />Roadable <br />Equipment <br />Haul Time (Hours): 0.16 0.16 <br />Return Time (Hours): 0.16 0.16 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 1.31 0.31 <br /> <br />JOB TIME AND COST <br /> <br /> Total job time: 2.62 Hours <br /> <br />Total job cost: <br /> <br />$7,694 <br />