My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-06_PERMIT FILE - M2018007
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018007
>
2018-02-06_PERMIT FILE - M2018007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2020 9:21:35 AM
Creation date
2/12/2018 9:59:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018007
IBM Index Class Name
Permit File
Doc Date
2/6/2018
Doc Name Note
Application
Doc Name
Application
From
Smash Brothers Exploration
To
DRMS
Email Name
ERR
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D -Reclamation PlanRule6.3.4 (Starts on Page 139 of the Rules) <br />The purpose of the Reclamation Plan is to describe the timing,used to reclaim the affected land to the proposed post-mininglandlands. This plan must be correlatedt to ExhibitpE - <br />procedures, <br />s . Reclamation <br />it and materials that will <br />c <br />beuse. <br />is required for all affectedMap. <br />1) <br />Primary future (Post-mining) land use (check one):Cropland (CR) Q._. Rangeland. (R Q Pastureland(PL)0._ Forestry FR n Genera)Agriculture GAC] Residential (RS) Recreation (RC) II_. Wildlife Habitat(WL) <br />Industrial/Commercial (I(")2) Please provide a general description of how the mined area willMinedareaswillfirstbebackfilledwithstockpiledwasterock. IatarateoItwillthenlbeReclaimed: <br />with hay mulchtonsacrean. pac e. . <br />own. t wi t en •e covere. wit stoc p!e• top._ soi,gra•e• an•drill seeded with zone 4 mix. <br />3) <br />What will the final grade of the reclaimed slopes (HorizonNote: If the Applicant proposes slopes steeper than 3H: 1 V( <br />exampleertical): <br />6 H: 1includeajustitication: VII:l V, 211: 1 V, etc.)—______please_- <br />i <br />a. Please provide a general description of the backfilling anddBackfillwillbedoneusingstockpiledwasterockusingaskidsteer. It will then be graded to itspre-mining slope with a mini excavators blade and skid ste <br />s ing: <br />er.4) <br />De th of topsoil to be salvaged (only for surface4-6 inchesdisturbances) (cher); <br />8-10 inches <br />6-8 inches one): <br />Other: <br />al 10-12 inches <br />N/A, explain:
The URL can be used to link to this page
Your browser does not support the video tag.