Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br />cost the State of Colorado using an independent contractor to complete reclamation. The <br />Office adds up to an additional maximum eighteen and one half(18.5%) percent of that <br />total,which includes a private contract,typical overhead costs and profit. <br />Direct Cost: se-e G <br />i. Backfilling:cubic yards) X $ cost per yard) =Total $ <br />ii. Grading: cubic yards) X $cost per yard)=Total $ <br />iii. Topsoil: cubic yards)X $cost per yard) =Total $ <br />iv. Seeding: acres)X $ cost per acre) =Total $ <br />v. Mobilization:Pieces of equipment)X $ cost per equipment)_ <br />Total $ <br />Direct Cost Subtotal: $ <br />Division's total overhead cost: X 18.5% <br />Division's Total cost: $ <br />Note: Based on the Division's experience the required financial warranty is normally set at <br />approximately$2,500 per acre. Therefore, a typical 5 acre permit will have a total required financial <br />warranty in the amount of$12,500.