Laserfiche WebLink
EXHIBIT C-Mining Plan <br />Rule 6.3.3 (Starts on Page 136 of the Rules) <br />The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br />operation. The plan must be correlated to Exhibit E—Map. <br />I) Estimated dates of commencement: 1/1./2018 and completion: 1/1/2022 <br />2) How many years is the mine anticipated to be operational: 4 years <br />3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br />l) all-yearlong or(n) seasonally,explain: Weather permitting <br />4) How many aces of the mine site will be disturbed at any given time: 3 acres <br />5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br />FT,4-6 inches 6-8 inches <br />l 8-10 inches 10-12 inches <br />0 Other: <br />l N/A, explain: <br />6) Will you need to move any overburden (check one): ( n)Yes or(n )No <br />a. If yes, approximately how thick is the overburden? feet <br />7) How will the mine be accessed: ( ) existing roads ( (l) new roads will be created <br />Please describe the existing roads: <br />There is an existing USFS trail that will provide access from Cedar Mountain rd. <br />a. If there will be new roads or road improvements, please describe the new roads and road <br />improvements: <br />There will be a total of 525' x 8' of new road built. They will provide access to area #1 and also <br />between area's 2 and 3. <br />8) Will water be needed during the mining operation (check one): ( )Yes or( )No <br />a. <br />If yes, please describe the source of the water and how much water will be used during the <br />operation: <br />9) Will any water diversions or impoundments be constructed (check one): ( n )Yes or La)No <br />a. <br />If yes, please describe the water diversions or impoundments: <br />10)Will any chemicals be used during the mining process (check one): ( )Yes or( ) No <br />a. if yes, please describe the chemical types and quantities to be utilized, chemical storage and <br />spill containment and emergency response plans for on-site spills. Plant operation details <br />should include tank capacities and operating solution volumes: