My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-08_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-02-08_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 11:06:53 AM
Creation date
2/9/2018 10:30:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/8/2018
Doc Name Note
Certification Report Comments
Doc Name
Certification Report Comments
From
CC&V / Newmont
To
DRMS
Type & Sequence
TR89
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine <br /> HGM Platform Extension CQA <br /> NewFields Job No.475.0106.019 <br /> Wednesday,August 02,2017 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: HIGH GRADE MILL(HGM) PLATFORM EXTENSION <br /> SITE: CRIPPLE CREEK&VICTOR GOLD MINE(COLORADO) <br /> CONTRACTOR: SCHMUESER ASSOCIATES <br /> DATE: WEDNESDAY,AUGUST 02,2017 <br /> TEMPERATURE: LOW:44°F TO HIGH: 71°F <br /> WEATHER: MOSTLY CLEAR, AFTERNOON THUNDERSTORM WITH PRECIPITATION <br /> NEWFIELDS PERSONNEL ONSITE: ERIC NIEBLER, FIELD TECHNICIAN <br /> 1.0 EARTHWORKS <br /> 1.1 General <br /> Pot holing was performed by Schmueser Associates to locate utilities along the existing mill <br /> platform. Existing berms were moved back from the slope to perform work below the slope in <br /> the following days. <br /> 1.2 Subgrade <br /> No work performed during the shift. <br /> 1.3 Select Structural Fill(iSSF) <br /> No select structural fill was transported, placed, or compacted during the shift. <br /> 2.0 NEWFIELDS AND/OR CONTRACTOR FIELD/LABORATORY TESTING <br /> No sample collection or testing was performed during this shift. <br /> 3.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the Schmueser Associates Daily Safety Meeting. <br /> 4.0 ISSUES,CONCERNS, MISCELLANEOUS ACTIVITIES <br /> Surveyors from Foresight West staked the boundaries as well as additional locations within the <br /> limits of the platform extension. <br /> There was a discussion regarding the platform extension design drawings. Existing ground in <br /> the area of the platform extension did not match up with the design drawings making it <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.