Laserfiche WebLink
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine <br /> HGM Platform Extension CQA <br /> NewFields Job No.475.0106.019 <br /> Monday,August 14,2017 <br /> 3.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the Schmueser Associates Daily Safety Meeting. <br /> 4.0 ISSUES,CONCERNS, MISCELLANEOUS ACTIVITIES <br /> A surveyor from Foresight West visited the site to re-stake the limits of the platform extension <br /> and confirm that the platform will tie-in to existing ground at a 2H:1V slope. The location of the <br /> ramp from the mill platform to the pipe bench was discussed to be relocated due to a water <br /> valve located within the proposed alignment. The water valve will not be relocated, but <br /> extended through use of a riser casing. It was agreed upon between Newmont and NewFields <br /> personnel that the road will be "field fit" to accommodate maintaining both the water valve <br /> and the proposed grade of the road. <br /> 5.0 PHOTOGRAPHS <br /> fi <br /> I <br /> Select structural fill loads left at HGM platform extension location from previous work day <br /> Page 2 <br />