My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-08_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-02-08_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 11:06:53 AM
Creation date
2/9/2018 10:30:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/8/2018
Doc Name Note
Certification Report Comments
Doc Name
Certification Report Comments
From
CC&V / Newmont
To
DRMS
Type & Sequence
TR89
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine <br /> HGM Platform Extension CQA <br /> NewFields Job No.475.0106.019 <br /> Vordsy,August 21.,2017 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: HIGH GRADE MILL(HGM)PLATFORM EXTENSION <br /> SITE: CRIPPLE CREEK&VICTOR GOLD MINE(COLORADO) <br /> CONTRACTOR: SCHMUESER ASSOCIATES <br /> DATE: MONDAY,AUGUST 23,2017 <br /> TEMPERATURE: LOW:45°F TO HIGH:69°F <br /> WEATHER: PARTLY CLOUDY IN MORNING, RAIN AND THUNDERSTORMS IN THE <br /> AFTERNOON <br /> NEWFIELDS PERSONNEL ONSITE: RYAN BARTINGALE, FIELD TECHNICIAN <br /> 1.0 EARTHWORKS <br /> 1.1 General <br /> The access road that extends east of the HGM platform was widened to a minimum width of 15 <br /> feet throughout the road alignment. Minor grading was performed on the HGM platform to <br /> flatten out any low and high spots on the platform. The HGM platform and access road are at <br /> final grade and alignment, no additional earthworks are planned for the platform area. <br /> Pipe bedding material to be used for HDPE pipe installation was stockpiled on the HGM platform <br /> using two Volvo A4OF articulated dump trucks (approximately 25 CY per load). Two 5-gallon <br /> bucket samples of the pipe bedding material were delivered to a soils laboratory located in <br /> Colorado Spring for gradation and standard Proctor compaction tests. Results of the gradations <br /> testing will be used to document bedding material is acceptable according to project <br /> specifications. The Proctor results will be used for target compaction of the material during <br /> placement. <br /> A plastic fence was set up around the area that will be dug to locate existing utilities that exit the <br /> existing mill. <br /> Red alert for lightning occurred from approximately 1:30 to 4:30pm. <br /> 1.2 Subgrade <br /> Minor subgrade preparation was conducted along the south perimeter of the access road. Prior <br /> to subgrade preparation,unsuitable materials composed of cobbles and boulders were removed <br /> from the ground surface. The subgrade was then compacted with a minimum of four passes with <br /> the BW211 Bomag vibratory roller. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.