My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-08_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-02-08_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 11:06:53 AM
Creation date
2/9/2018 10:30:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/8/2018
Doc Name Note
Certification Report Comments
Doc Name
Certification Report Comments
From
CC&V / Newmont
To
DRMS
Type & Sequence
TR89
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> HGM Platform Extension CQA <br /> NewFields Job No.475.0106.019 <br /> Tuesday,August 08,2017 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: HIGH GRADE MILL(HGM) PLATFORM EXTENSION <br /> SITE: CRIPPLE CREEK&VICTOR GOLD MINE(COLORADO) <br /> CONTRACTOR: SCHMUESER ASSOCIATES <br /> DATE: TUESDAY,AUGUST 08, 2017 <br /> TEMPERATURE: LOW:41°F TO HIGH: 67°F <br /> WEATHER: MOSTLY CLEAR,AFTERNOON THUNDERSTORM WITH PRECIPITATION <br /> NEWFIELDS PERSONNEL ONSITE: ERIC NIEBLER, FIELD TECHNICIAN <br /> 1.0 EARTHWORKS <br /> 1.1 General <br /> Berms along the edge of road beneath the mill platform were continually raised to appropriate <br /> heights as the road was raised with select structural fill. <br /> L.2 Subgrade <br /> Existing slopes between the mill platform and road beneath it were cleaned of unsuitable <br /> material, primarily large cobbles and boulders, with an excavator and then compacted with the <br /> roller in order to provide a competent surface for the select structural fill to tie in with. <br /> 1.3 Select Structural Fill(SSF) <br /> Select structural fill was transported and dumped by a Volvo A4OF articulated dump truck <br /> (approximately 25 CY per load). The fill was spread using a Volvo H061 loader to a loose <br /> thickness of 12 inches and compacted with a BW211 Bomag roller using the method <br /> specification for compaction. <br /> 22.0 NEWFIELDS AND/OR CONTRACTOR FIELD/LABORATORY TESTING <br /> Two samples of select structural fill were collected and tested for moisture content on site by <br /> NewFields personnel. The fill tested at 9.1 and 8.5 percent moisture content, within the <br /> allowable range. <br /> 3.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the Schmueser Associates Daily Safety Meeting. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.