Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year ______________ <br /> <br /> <br />______________________ _______________________ ________________________ <br /> mine name permit # Permittee <br /> <br />Address: ___________________________________________________________________________ <br /> <br /> <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category <br />Last Years <br />Cumulative Total <br /> <br /> <br />This Calendar <br />Year Cumulative Total 1 <br />Acres disturbed + = <br />Acres backfilled and graded + = <br />Acres topsoiled + <br /> <br />= <br /> <br /> <br /> <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years <br />Cumulative <br />Total <br />This <br />Calendar <br />year <br />Cumulative <br />Total 1 <br /> <br /> <br />10 years or <br />less <br /> <br /> <br />Greater <br />than 10 <br />years 1 <br />Acres seeded* + = = + <br />*include, if necessary, a description of any augmented seeding or cultural practices <br /> <br /> <br />For the Entire Life of Mine, the total number of acres disturbed ___________ and the total number of acres: <br /> <br />Phase I released __________ Phase II released __________ Phase III released __________ <br /> <br /> <br />For Mines in Permanent Cessation: <br /> <br />Total acreage in facilities subject to reclamation but yet to be completed ___________ <br /> <br /> <br />For Government Performance and Results Act <br /> <br />Acreage in long-term mining or reclamation facilities 2__________________ <br /> <br />Acreage in active mining areas 3_______________ <br /> <br />1(exclude acres where Phase III release has been achieved) <br /> <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br /> <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />2017 <br /> Terror Creek Loadout C-1983-059 Oxbow Mining, LLC <br />P.O. Box 535, Somerset, CO 81434 <br />13.6 0 13.6 <br />0 0 0 <br />0 0 0 <br />0 0 0 0 0 <br /> 0 <br /> 0 0 0 <br /> N/A <br /> 13.6 <br /> 0