Laserfiche WebLink
<br /> <br /> <br /> <br /> 10 <br /> <br /> No changes to the support facilities were proposed in the PR-2 application. <br /> <br />III. Hydrologic Balance - Rule 4.05 <br /> <br /> A. Water Quality Standards and Effluent Limitations <br /> <br /> No water quality standards and effluent limitation changes were proposed in the PR- <br />2 application. <br /> <br /> B. Diversions and Conveyance of Overland Flow <br /> <br />No changes to diversions and conveyance of overland flow were proposed in the <br />PR-2 application. <br /> <br /> C. Stream Channel Diversions <br /> <br />No stream channel diversions were proposed in the PR-2 application. <br /> <br /> D. Sedimentation Ponds <br /> <br />No changes to sediment ponds were proposed in the PR-2 application. <br /> <br /> E. Acid-forming and Toxic-forming Spoil <br /> <br />No changes to acid-forming and toxic-forming spoil were proposed in the PR-2 <br />application. <br /> <br /> F. Impoundments <br /> <br />No changes to impoundments were proposed in the PR-2 application. <br /> <br /> G. Surface and Ground Water Monitoring <br /> <br />No changes in the surface and ground water monitoring program were proposed in <br />the PR-2 application. <br /> <br />H. Transfer of Wells <br /> <br /> No specific approvals granted. <br /> <br /> I. Discharge of Water into an Underground Mine <br /> <br /> This section does not apply as New Horizon North is a surface mine. <br />