Topsoil from newly disturbed areas will be spread on previously reclaimed <br /> areas. If there are no areas to reclaim as topsoil is being produced,-exeess-topsoil <br /> from the western areas of Stages 2, 1, 5, and 6 will be stockpiled in Stage 6 or 7 as <br /> appropriate. In the eastern areas of Stages 2, 4, and 5 topsoil will be stockpiled <br /> along the northern, western, eastern or southern permit beundaffboundaries . The <br /> majority north half of Stages 2 and 4 is devoid of topsoil because of prelaw mining <br /> or because of disturbance caused by the sports cycle park. <br /> After topsoil is removed, the overburden is mined and used to reclaim <br /> mined areas. In the event there are no areas to reclaim as overburden is being <br /> produced from Stage 8, excess overburden will largely be stockpiled west of the <br /> mining operations and east of the topsoil stockpile in Stages 277 or 8 4, 5, and 7. If <br /> there is no space available to stockpile overburden from Stage 8 then overburden <br /> will be stockpiled in Stages 5 or 6. In the event there are no areas to reclaim as <br /> overburden is being produced from Stages 4 or 6, excess overburden will be <br /> stockpiled in Stages 5 or 6. The overburden stockpiles located near topsoil <br /> stockpiles will be kept separate from the topsoil stockpiles. After the overburden is <br /> removed, the clay will be mined and stockpiled. <br /> The clays to be mined lie in almost vertical strata (70 to 80 degrees from <br /> horizontal) which are interbedded with sandstone and coal seams. Clay stockpiles <br /> will be located in east and south of the mining operation in Stages 2— and 4- . <br /> Large volumes of sandstone and coal, called interburden, in the clay will <br /> make the material unsuitable for the manufacture of brick. Approximately 40 <br /> percent of the pit volume is expected to produce interburden. Interburden is mined <br /> in conjunction with the clay and used to reclaim mined areas. In the event there are <br /> no areas to reclaim as interburden is being produced, excess overburden will <br /> largely be stockpiled in Stages 5 or 6 and west of the topsoil stockpile. excess <br /> northern, eastern or southern permit boundaries in Stages 2, 1-& 5 or in the eastern <br /> 12 Revised October 2017 <br />