Laserfiche WebLink
Notes: If the Permit is not amended by within 210 days after ratification, unless this date is extended by DRMS, <br /> this Work Plan shall be amended to include the design and implementation of this task under EPA authority <br /> and oversight. <br /> Deliverables Due Dates <br /> Apply for Succession of Operator with DRMS 30 days after ratification <br /> Submit amendment to Active Mining Permit including design of proposed 120 days after ratification <br /> erosion control features on the modern tailings. <br /> DRMS approval of amended Active Mining Permit to include components of a 210 days after ratification <br /> work plan. <br /> Initiate construction of erosion control features on the modern tailings. July 1, 2018 <br /> Page 5 of 5 <br />