My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_REPORT - M1999051
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999051
>
2018-02-05_REPORT - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 8:32:33 AM
Creation date
2/6/2018 8:19:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
Report
Doc Date
2/5/2018
Doc Name Note
Additional Report informatoin
Doc Name
Annual Fee/Report/Map
From
Daub & Associates, Inc.
To
DRMS
Annual Report Year
2018
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iniMiNEMMEMMIWc- <br /> Ak <br /> Natural Soda LLC 2017 Project Status Report & Annual Plan of Development <br /> 6.0 Land Disturbance and Reclamation <br /> 6.1 Summary of 2017 Disturbance <br /> NS did not create any new disturbed acreage in 2017. The total disturbed acreage <br /> reported in 2016 was 94.88 acres. In 2017, it was determined that a more accurate <br /> accounting of the NS land disturbance would be 97.29 acres. The 1A-4H1, 1A-5HR, and <br /> the 3A-5V pads are adjacent to one another and were reported in 2016 as having a <br /> combined acreage of 2.30 acres. Following a review in February 2017, it was determined <br /> that a more accurate representation of the disturbance for these three pads would be a <br /> combined total of 4.71 acres. This 2.41 acre increase accounts for the difference between <br /> the 2016 (94.88 acres) and 2017 (97.29 acres) reported totals. The P&A of the BG-8(DS- <br /> 4) well in May 2017 and subsequent reclamation activities on the pad changed the status <br /> of the pad disturbance from interim reclaimed to reclaimed. Table 8 lists the disturbed <br /> acreage as of December 2017. <br /> Table 8: Disturbed Acreage <br /> Process Area: Acres: <br /> Plant Site Disturbed 26.84 <br /> Plant Site Interim Reclaimed 4.46 <br /> Well Field: <br /> Roads Disturbed 2.45 <br /> Well Pads Disturbed 21.26 <br /> Roads/Misc. Interim Reclaimed 5.33 <br /> Well Pads Interim Reclaimed 11.71 <br /> Well Pad Reclaimed 25.24 <br /> Total Disturbance: 97.29 <br /> DAUB&ASSOCIATES. INC. 25 January 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.