My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_REPORT - M1999051
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999051
>
2018-02-05_REPORT - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 8:32:33 AM
Creation date
2/6/2018 8:19:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
Report
Doc Date
2/5/2018
Doc Name Note
Additional Report informatoin
Doc Name
Annual Fee/Report/Map
From
Daub & Associates, Inc.
To
DRMS
Annual Report Year
2018
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda LLC 2017 Project Status Report & Annual Plan of Development <br /> 4.0 2017 Project Activities <br /> 4.1 On-Site Facilities and Process Description <br /> 4.1.1 General Arrangement <br /> Figure 5 provides an overview of the NS process flow. <br /> 4.1.2 Lab Operation / Sanitation / ISO <br /> In 2017, activities continued in the laboratory to provide analysis for process control, <br /> quality assurance, and regulatory requirements. <br /> • Plant operators performed process control analyses. <br /> • Chloride levels were monitored by both operations and laboratory personnel on all <br /> USP grades to ensure USP standards were met. <br /> • The USP test for insoluble materials was conducted on a per lot basis by <br /> laboratory personnel and a filter test for insoluble materials was conducted on the <br /> dry product, once per shift by operators. <br /> • Pests were controlled with the use of two UV bug lights and rodent traps around the <br /> interior and exterior walls of the plant. <br /> • GMP/ISO/Sanitation training was provided for all employees as required. <br /> • A food safety audit for FSSC 22000 was conducted for which Natural Soda <br /> maintained GFSI certification. <br /> • CDPHE, NSF, OMRI, Kosher, Halal, and ISO 9001 certifications were maintained. <br /> 4.1.3 Process, Utilities, Facilities <br /> In 2017 NS did construct a new load out facility. NS did not make any other significant <br /> improvements to process, utilities or facilities. Figure 5 illustrates the general process <br /> flow. <br /> DAUB&ASSOCIATES. INC. , 13 January 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.