My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2018-02-05_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 7:36:30 AM
Creation date
2/6/2018 6:58:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/5/2018
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2017
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -3- 2017 Annual Reclamation Report <br />Haul Roads to CRDA 1, 2 and 3 (No. 35 Below) (Ph III release on 3.4 <br />acres in 2015) 3.4 <br />Total 13.7 <br />Acres Disturbed by Mining Activities 241.5 <br />Less Previously Reclaimed Areas 227.8 <br />Less Permanently Disturbed Areas 13.7 <br />Equals Remaining Reclamation Acres 0.0 <br />(c) Area backfilled and graded - 0 acres during 2017. <br />(d) Area Top -soiled - 0 acres during 2017. <br />(e) Area Seeded - 0 acres during 2017. Normal husbandry inter -seeding was <br />conducted at the North Decline in December 2017 where Ute Water had <br />potholed a small area (approx. 40'x20') to locate their raw water line. Seed Mix <br />is attached (seed mix approved by J. Ebert, DRMS, as reported in 2016 ARR). <br />(f) Whitetop was treated in April, using Curtail, at Conveyor Corridor and Light Use <br />Road #1. Halogeton was treated in June, using Chlorsulfuron, at the North <br />Decline, Conveyor Corridor and Light Use Road #1. <br />(g) Areas Seeded up through 2017. (Permanent) <br />1. Blue Flame Mine - Deleted - Reclamation work was performed voluntarily <br />and therefore not required for this report. <br />2. Permanent Flood Control Dike - between the overland conveyor and the <br />river (see Permanent Flood Control Dike - TR01, Volume 7). Phase I <br />Bond Release was approved on 2.8 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 2.8 acres with SL -7 on April <br />26, 2011. Located in SW%SE%, Section 27, T1 OS, R98W, 6th P.M. <br />Area - 2.8 acres <br />Date - Fall 1985 <br />Seed Mix - No seed mix information on file. <br />Phase III Bond Release - 2.8 acres <br />3. South Lease Exploration - drill pads and access roads to drill holes <br />PCC -04 through PCC -10 (see South Lease Exploration Plan - TR04, <br />MR10 and MR11, Volume 8). Phase I Bond Release was approved on <br />4.0 acres with SL -2 on October 27, 2003. Phase II & III Bond Release <br />was approved on 4.0 acres with SL -8 on November 14, 2015. Located in <br />Section 12 and 13, T11S, R98W, 6th P.M. Reference Exhibit SL -07-021. <br />Area - 4.0 acres. <br />Date - Fall 1985 <br />Seed Mix - No seed mix information on file. <br />Phase I I I Bond Release - 4.0 acres <br />4. South Lease Exploration - drill pads and access roads to drill holes <br />PCC -01 through PCC -03 and access road from Colorado Ute <br />
The URL can be used to link to this page
Your browser does not support the video tag.