My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_PERMIT FILE - M2017056
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017056
>
2018-02-05_PERMIT FILE - M2017056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 9:58:33 AM
Creation date
2/5/2018 1:07:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017056
IBM Index Class Name
Permit File
Doc Date
2/5/2018
Doc Name Note
Adequacy Review Response
Doc Name
Adequacy Review Response
From
Blue Earth Solutions
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 15, 2017 <br />Sinclair Pipeline Company <br />PO Box 185 <br />Sinclair, WY 82334 <br />RC_ Additional Proposed Extraction of Gravel Mater,ais and Revised Reclamation Plan <br />Harmony Gardens Windsor Site <br />Structure Agreement Required for a State of Colorado Dept. of Reclamation, Mining <br />and Safety Permit <br />To Whom It May Concern, <br />Serfer Land Ventures and Connell Resources Inc. is submitting an additional permit request to the State of <br />Colorado Division of Reclamation, Mlning and Safety (DBMS) for the purposes of additional gravel mining <br />and reclamation for the following iocation; <br />Harmony Gardens Site Located in the SE quadrant of WCR 74 and WCR 13 <br />(See Detail Map Attached) <br />Serfer Land Ventures will be the permit molder and Connell Resources Inc. will extract the gravel as <br />approved by this permit and the Town of Windsor oversight. <br />• Serfer Land Ventures will be the permit holder and Conneil Resources Inc will be the operator <br />• Due to future business plans the property will be graded to daylight the pit bottom to the <br />existing land contours on the south end of the existing, pits <br />• Excavate and Remove Gravel off Site (total depth 10` to 11'J <br />• Reclaim with minimum 3:1 S#ape=topsail. and seed <br />• Trucks will follow established haul route that crosses the pipeline as shown <br />As part of the permit application, DRM5 requires a Structure Agreement between the operator (Connell) <br />and any Structure or Utility within 200' of the mining area. The enclosed form is recommended by DBMS <br />so please sign, notarize and return as soon as practical. !f you are not lncl?ned to sign this form you can <br />supply a notarized letter as per Structure Agreement paragraph C. <br />Any questions feel free to call: <br />Kevin Anderson 970 214-1601 cell <br />John Warren 970 231-9278 cell <br />Chris Serbousek 303 419-6781 cell Serfer Land Ventures <br />Sincerely, <br />Serfer Land Ventures <br />Chris Serbousek <br />r ./ <br />
The URL can be used to link to this page
Your browser does not support the video tag.