My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_GENERAL DOCUMENTS - C1992081
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1992081
>
2018-02-05_GENERAL DOCUMENTS - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 12:38:12 PM
Creation date
2/5/2018 12:36:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
General Documents
Doc Date
2/5/2018
Doc Name Note
For RN5
Doc Name
Proposed Decision and Findings of Compliance
From
Hayden Gulch Terminal, LLC
To
DRMS
Permit Index Doc Type
Findings
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision <br />The Colorado Division of Reclamation, Mining and Safety proposes to APPROVE Hayden <br />Gulch Terminal, LLC's application for permit renewal (RN -05) for the Hayden Gulch Loadout. <br />This decision is based on a finding that the operations will comply with all requirements of the <br />Colorado State Program as found in the Colorado Surface Coal Mining Reclamation Act, C.R.S. <br />34-33-101 et seq., and the Regulations promulgated pursuant to the Act. <br />If no request for a formal hearing is made within thirty (30) days of the first publication of the <br />issuance of this proposed decision, then this decision becomes final. The permit application, all <br />supporting documentation, and any stipulations or conditions will become a binding part of the <br />permit. <br />Stipulation No. 9: Prior to initiation of reclamation for lands associated with the Tie Across <br />Haul Road, the permittee shall submit a technical revision to the permit which provides a <br />reclamation plan, sampling methodologies and reclamation success requirements for the <br />cropland areas in accordance with Rule 2.05.4(2)€, Rule 4.15.1(2)(c), Rule 4.15.9 and Rule <br />4.15.7(2). The technical revision need to be approved prior to initiation of reclamation activities <br />associated with the Tie -Across Haul Road cropland areas. Stipulation No. 9 remains active. <br />No new stipulations have been added with this Permit Renewal No. 5. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.