My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_REVISION - C1992081 (29)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2018-02-05_REVISION - C1992081 (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 12:38:12 PM
Creation date
2/5/2018 9:55:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
2/5/2018
Doc Name
Proposed Decision and Findings of Compliance
From
Hayden Gulch Terminal, LLC
To
DRMS
Type & Sequence
RN5
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision <br />The Colorado Division of Reclamation, Mining and Safety proposes to APPROVE Hayden <br />Gulch Terminal, LLC's application for permit renewal (RN -05) for the Hayden Gulch Loadout. <br />This decision is based on a finding that the operations will comply with all requirements of the <br />Colorado State Program as found in the Colorado Surface Coal Mining Reclamation Act, C.R.S. <br />34-33-101 et seq., and the Regulations promulgated pursuant to the Act. <br />If no request for a formal hearing is made within thirty (30) days of the first publication of the <br />issuance of this proposed decision, then this decision becomes final. The permit application, all <br />supporting documentation, and any stipulations or conditions will become a binding part of the <br />permit. <br />Stipulation No. 9: Prior to initiation of reclamation for lands associated with the Tie Across <br />Haul Road, the permittee shall submit a technical revision to the permit which provides a <br />reclamation plan, sampling methodologies and reclamation success requirements for the <br />cropland areas in accordance with Rule 2.05.4(2)€, Rule 4.15.1(2)(c), Rule 4.15.9 and Rule <br />4.15.7(2). The technical revision need to be approved prior to initiation of reclamation activities <br />associated with the Tie -Across Haul Road cropland areas. Stipulation No. 9 remains active. <br />No new stipulations have been added with this Permit Renewal No. 5. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.