My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-02_REVISION - C1981019 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-02-02_REVISION - C1981019 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 12:48:10 PM
Creation date
2/5/2018 7:39:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/2/2018
Doc Name
Adequacy Review #2
From
Tri-State Generation and Transmission Association, Inc.
To
DRMS
Type & Sequence
TR116
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Permit - Page l I <br />Permit No. COR -030000 <br />D, TERMS AND CONDITIONS (cont.) <br />3, Probibition or Non-Stormwater Discharges <br />a) Except as provided in paragraphs b, c, and d below, all discharges covered by this permit shall be composed <br />entirely of stormwater associated with construction activity. Discharges of material other than storniwater must <br />be addressed in a separate CDPS permit issued for that discharge. <br />b) Discharges from the following sources that are combined with stonuwater discharges associated with construction <br />activity may be authorized by this permit, provided that the non-stormwater component of the discharge is identified <br />in the SWMP (see Part I.C,I.g of this permit): <br />emergency fire fighting activities - landscape irrigation return flow <br />- uncontaminated springs <br />c) Discharges to the ground of concrete washout water from washing of tools and concrete mixer chutes may be <br />authorized by this permit, provided that: <br />1) the source is identified in the SWMP; <br />2) BMPs are included in the SWMP in accordance with Part I.C,3(c)(7) and to prevent pollution of groundwater in <br />violation of Part LD.1.a; and <br />3) these discharges do not leave the site as surface runoff or to surface waters <br />d) Discharges to the ground of water from construction dewatering activities may be authorized by this permit, <br />provided that: <br />1) the source is groundwater and/or groundwater combined with stormwater that does not contain pollutants in <br />concentrations exceeding the State groundwater standards in Regulations 5 CCR 1002-41 and 42; <br />2) the source is identified in the SWMP; <br />3) BMPs are included in the SWMP, as required by Part I.C.3(c)(3); and <br />4) these discharges do not leave the site as surface runoff or to surface waters. <br />Discharges to the ground from construction dewatering activities that do not meet the above criteria must be covered <br />under a separate CDPS discharge permit. Contaminated groundwater requiring coverage under a separate CDPS <br />discharge pennit may include groundwater contaminated with pollutants from a landfill, mining activity, industrial <br />pollutant plume, underground storage tank, or other source. <br />4. Releases In Exre44 of Rmurtablc 0 uantldes <br />This permit does not relieve the permittee of the reporting requirements of 40 CFR 110, 40 CFR 117 or 40 CFR 302. Any <br />discharge of hazardous material must be handled in accordance with the Division's Noncompliance Notification <br />Requirements (see Part II.A.3 of the permit). <br />5, 8W1V1P 1icgtitirements <br />a) SWMP Preparation and Implementation: The SWMP shall be prepared prior to applying for coverage under the <br />general pennit, and certification of its completion submitted with the application. The SWMP shall be implemented <br />prior to commencement of construction activities. The plan shall be updated as appropriate (see paragraph c, <br />below), below). SWMP provisions shall be implemented until expiration or inactivation of permit coverage. <br />b) SWMP Retention Requirements: A copy of the SWMP must be retained on site unless another location, specified <br />by the permittee, is approved by the Division. <br />c) SWMP Review/Changes: The permittee shall amend the SWMP: <br />1) when there is a change in design, construction, operation, or maintenance of the site, which would require the <br />implementation of new or revised BMPs; or <br />2) if the SWMP proves to be ineffective in achieving the general objectives of controlling pollutants in stomtwater <br />discharges associated with construction activity; or <br />
The URL can be used to link to this page
Your browser does not support the video tag.