My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-02_REVISION - C1981019 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-02-02_REVISION - C1981019 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 12:48:10 PM
Creation date
2/5/2018 7:39:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/2/2018
Doc Name
Adequacy Review #2
From
Tri-State Generation and Transmission Association, Inc.
To
DRMS
Type & Sequence
TR116
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO WATER QUALITY CONTROL DIVISION NOTICE OF TERMINATION www:roloraclowaterliermits.coni <br />PART D. TERMINATION VALIDATION CRITERIA <br />One of the criteria (1 or 2) below must be met, the appropriate box checked, and the required additional <br />information provided. Part E includes a certification that the criteria indicated has been met. <br />1: Finally Stabilized or Construction Not Started - The permitted activities covered under the certification <br />listed in Part A meet the requirements for FINAL STABILIZATION in accordance with the permit, the Stormwater <br />Management Plan, and as described below. This criterion should also be selected if construction was never started and <br />no land was disturbed, and an explanation of this condition provided in the description below. <br />Final stabilization is reached when: all ground surface disturbing activities at the site have been completed including <br />removal of all temporary erosion and sediment control measure, and uniform vegetative cover has been established with <br />an individual plant density of at least 70 percent of precilsturbance levels, or equivalent permanent, physical erosion <br />reduction methods have been employed, <br />REQUIRED for Criteria 1- Describe the methods used to meet the final stabilization c described above: <br />Include an attachment if additional space is required. <br />-OR- <br />2: Separate Permit Coverage or Full Reassignment - All ongoing construction activities, including all disturbed <br />areas, covered under the permit certification listed in Part A have coverage under a separate CDPS stormwater <br />construction permit, including the permit certification issued when Division's Reassignment Form was used by the <br />permittee to reassign all areas/activities. <br />RECC,UIRE D for Criteria 2 — Provide the permit certification number covering the ongoing activities: <br />COR03 <br />One of the two criteria above MUST BE CHECKED and the required information for that criterion provided, i <br />STOP! or this form will not be processed and the permit will remain active, <br />• PART E. CERTIFICATION SIGNATURE Reqjiirgd for all Termination Requests) <br />I understand that by submitting this notice of inactivation, I am no longer authorized to discharge stormwater associated with <br />construction activity by the general permit, I understand that discharging pollutants in stormwater associated with construction <br />activities to the waters of the State of Colorado, where such discharges are not authorized by a CDPS permit, is unlawful under <br />the Colorado Water Quality Control Act and the Clean Water Act. <br />I certify under penalty of law that I have personally examined and am familiar with the information submitted herein, and based <br />on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, <br />accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility <br />of fine and imprisonment. (See 18 U.S.0 1001 and 33 U.S.C. 1319,) <br />I also certify that I am a duly authorized representative of the permittee named in Part B. <br />Signature of Legally Responsible Party Date Signed <br />Name (printed) Title <br />Signatory requirements: This form shall be signed, dated, and certified for accuracy by the permittee In accordance with the following criteria: <br />1. In the case of a corporation, by a principal executive officer of at least the level of vice-president, or his or her duly authorized representative, if such <br />representative Is responsible for the overall operation of the operation from which the discharge described herein originates; <br />2. In the case of a partnership, by a general partner; <br />3. In the case of a sole proprietorship, by the proprietor; <br />4. In the case of a municipal, state, or other public operation, by wither a principal executive officer, ranking elected official, or other duly authorized <br />employee. <br />Page 2 of 2 form last revised July 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.