HIGHLIGHTS <br />CONSTRUCTION ACTIVITY <br />STORMWATER GENERAL PERMIT <br />PERMIT REQUIREMENTS: <br />* Inspections: Inspection of stormwater management system <br />required at least every 14 days and after any precipitation or <br />snowmelt event that causes surface erosion. (See Inspections, page <br />12 of the permit, enclosed.) <br />* Records: Records of inspections must be kept and be available for <br />review by the Division. <br />* Stormwater Management Plan (SWMP): A copy of the SWMP <br />must be kept on the construction site at all times. <br />PERMIT FEE: <br />* Send payment only when you receive an invoice (sent once a year). <br />PERMIT TERMINATION AND TRANSFER: <br />* If the facility is finally stabilized, you may inactivate the permit, <br />using the enclosed Division form. <br />* "Final stabilization" is reached when all the construction is <br />complete, paving is finished, and the vegetation (grass, etc.) is <br />established, not just reseeded. See permit, page 9. <br />* If the entire site changes ownership, you should transfer the permit <br />to the new owner. <br />* If part of the site will be sold to a new owner, you will need to <br />reassign permit coverage. <br />* Forms for these actions are available on our website, below. Also <br />see page 5 of the permit. <br />QUESTIONS? <br />* www.coloradowaterpermits.com <br />* Email cdphe.wgstorm@state.co.us <br />* Or call (303)692-3517, ask for Kathy Rosow <br />6/07 <br />