<br />
<br />
<br />
<br />
<br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us
<br />
<br /> COAL MINING PERMIT - PERMIT RENEWAL DECISION
<br /> Peabody Sage Creek Mine, Peabody Sage Creek Mining, LLC
<br /> Permit No. C-2009-087
<br />
<br />The Division of Reclamation, Mining and Safety has proposed the decision stated below.
<br />Provided there are no objections, the Division will issue the permit upon the termination of the
<br />thirty (30) day public comment period, in accordance with Rule 2.07.4(3)(c).
<br />
<br />Permit Renewal No. 1 Decision: Approve
<br />Submittal Date: January 27, 2015 Decision Date: January 31, 2018
<br />Description of Renewal: Permit Renewal Applicaton.
<br />
<br />
<br />DIVISION OF RECLAMATION, MINING AND
<br />SAFETY
<br />PERMITTEE
<br />
<br />
<br />
<br />
<br />Authorized Representative - Division Authorized Representative - Permittee (if applicable)
<br />
<br />Date: February 1, 2018
<br />
<br />Date:
<br />
<br />CHANGE IN ACREAGE REVISED TOTAL ACREAGE PERFORMANCE BOND
<br />Disturbed: 0.00 Disturbed: 818.02 Prior Liability: $3,261,898.73
<br />Affected: 0.00 Affected: 1,543.52 Change in Liability: ($184,563.73)
<br />Permit: 0.00 Permit: 10,164.00 Revised Liability: $3,077,335.00
<br />State: 0.00 State: 5,208.00 Bond Held: $3,356,429.28
<br />Federal: 0.00 Federal: 80.00
<br />Private: 0.00 Private: 4,876.00
<br />County: 0.00 County: 0.00
<br />
<br />
<br />REVISED APPLICATION PAGES REVISED MAPS
<br />Revised TOC (List of Figures Pages iii and iv, List of
<br />Tables Page v, List of Exhibits Page vii, viii, ix)
<br />Pages 2.03-11, 12, 13, 14, 15, 16, 19, 20 and 21
<br />Pages 2.04-10, 11, 12, 13, 14, 147, 148, 149, 150,
<br />166, 167, 168, 168, 170, and 171
<br />Pages 2.05-3, 7, 38, 63, 64, 67.1, 89, 90, 91, 92, 93,
<br /> Revised Map 2.03.4-M1 in Vol 4
<br />Revised Map 2.04.7-M1 in Vol 4A
|