My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-31_HYDROLOGY - M1977208
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977208
>
2018-01-31_HYDROLOGY - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 7:17:43 AM
Creation date
1/31/2018 11:10:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Hydrology
Doc Date
1/31/2018
Doc Name Note
Revised Groundwater Monitoring Plan 4th Quarter 2017 Monitoring Data
Doc Name
Water Monitoring - Groundwater
From
CEMEX
To
DRMS
Type & Sequence
TR12
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z/CC-MEX <br />January 30, 2018 <br />Ms. Amy Eschberger <br />Division of Reclamation, Mining and Safety <br />Environmental Protection Specialist <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />JAN 31 2018 <br />DMSION OF RECLAMATION <br />MINING AND SAFETY <br />Via FEDEX <br />TRK #7713 3776 3928 <br />Re: CEMEX Lyons Mine Permit M-1977-208 <br />Technical Revision No. 12, Revised Groundwater Monitoring Plan <br />Fourth Quarter 2017 Monitoring Data <br />Dear Ms. Eschberger: <br />This letter transmits the surface water and groundwater data associated with the sampling of the <br />cement kiln dust disposal area (C -Pit). This report includes data from the C -Pit ponded water and <br />related groundwater monitoring for the third quarter of 2017, covering the reporting period from <br />October 1, 2017 to December 31, 2017. Table 1 presents data for the last four quarters. <br />Compliance monitoring water samples were collected on October 11, 2017 from the CEM-oo1 and <br />CEM -o04 groundwater monitoring wells, and from the C -Pit ponded water. The inspection of <br />groundwater monitoring well CEM -005 on October 11, 2017 indicated that there was not enough <br />water volume to collect a representative sample. <br />The samples collected from C -Pit ponded water and the groundwater monitoring wells were <br />analyzed for pH, chloride, sulfate, total dissolved solids, selenium, and thallium. The reported pH <br />data is based on the pH analysis performed at the time of sample collection in the field (Table 1). <br />The measured pH at groundwater monitoring well CEM -004 and analytical results for chloride, <br />sulfate, total dissolved solids (TDS), selenium and thallium from the October 11, 2017 groundwater <br />sample were within the target levels prescribed by TR -12, as shown in Table 1. However, pH <br />measurement of 8.58 s.u. from the CEM 004 sample indicated a slightly higher level than the <br />CEM005 trigger of 8.5 s.u. <br />In addition, a Stiff Diagram of the groundwater cation/anion data from CEM -o04 compared to the <br />average and 901h percentile of the cation/anion concentrations from the last four quarterly samples <br />of C -Pit data is provided in Figure 1 for reference. As shown in Figure 1 and consistent with past <br />reports, the signature for CEM -o04 continues to be significantly different from that of C -Pit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.