My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-30_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2018-01-30_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 4:06:29 PM
Creation date
1/30/2018 11:42:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/30/2018
Doc Name Note
Request for TR
Doc Name
Request for Technical Revision
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR29
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AZCW <br />Henderson 3 Dam Buttress Design <br />January26, 2018 <br />Page 12 <br />Borrow Source <br />The selected buttress fill is tailings material borrowed from selectively borrowed material from the <br />slopes of 1 Dam. The material will need to be free of deleterious material. <br />MONITORING CONSIDERATIONS <br />The slope shall be monitored continuously throughout construction If signs of slope instability <br />(tension cracking, sloughing, slope rotation, etc.) are observed, work shall be immediately stopped <br />and the Engineer shall be notified. <br />Piezometer responses in the area shall also be closely monitored through the use of Canary. <br />Increased frequency of readings will be required. Any signs of instability or if the pore pressure ratio <br />begins to approach 1, the Engineer shall be notified and work shall remain stopped until approved by <br />the Engineer. <br />M.=SWr*ft WTRM514%_HDN &ariSG"almmElm%DRMS R@p& WpwW4"Wmah_ 3 Dem &am Dnlpr Leaw Repw1_Ra B_ Finale <br />
The URL can be used to link to this page
Your browser does not support the video tag.