Laserfiche WebLink
Bond Release <br />been released. <br />- 5 - Revised November 17, 2017 <br />Revised January 19, 2018 <br />During the SI.04 bond release process, 10.71 acres for the ROM area obtained Phase I release, which <br />included the ROM pond (0.51 acres). Therefore, the ROM pond has already been granted Phase I release <br />and should not be added to the phase I request area. <br />Both of the aforementioned areas are summarized in the bond release spreadsheet, but a note has been <br />added that they were released with SI.04. The only areas in this request that have not already received <br />Phase I release are the 4 ponds. <br />Please call if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosures (revisions 01/18) <br />1. Figures 1 & 3 <br />2. Exhibit 1 <br />