Laserfiche WebLink
January 16, 2018 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 5 <br /> <br />Section 16 <br />Prospect <br />Gulch A <br />Streeter <br />West Pit <br />Work Area <br />Wash Bay <br />Gossard <br />Loop <br />EP1 <br />EP2 <br />NTEP1 <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />Collom Haul Road construction continues. Scrapers and dozers ca n been seen along the length of the road. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The East Pit reclamation remains stable. No signs of major erosion or gullying could be observed. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />Construction of the Collom Facility area was actively being worked on. Majority of the heavy equipment was <br />observed along the facility area. <br /> <br />The raw water line to the Collom Facility area has been installed and buried. No issues could be observed. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil piles along the haul road have been shaped. Majority of the topsoil piles were completed prior to this <br />inspection. <br /> <br /> <br /> <br /> <br /> <br />