My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-24_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2018-01-24_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2018 6:42:28 AM
Creation date
1/29/2018 6:30:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
1/24/2018
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company
Inspection Date
1/16/2018
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 16, 2018 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 5 <br /> <br />Section 16 <br />Prospect <br />Gulch A <br />Streeter <br />West Pit <br />Work Area <br />Wash Bay <br />Gossard <br />Loop <br />EP1 <br />EP2 <br />NTEP1 <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />Collom Haul Road construction continues. Scrapers and dozers ca n been seen along the length of the road. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The East Pit reclamation remains stable. No signs of major erosion or gullying could be observed. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />Construction of the Collom Facility area was actively being worked on. Majority of the heavy equipment was <br />observed along the facility area. <br /> <br />The raw water line to the Collom Facility area has been installed and buried. No issues could be observed. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil piles along the haul road have been shaped. Majority of the topsoil piles were completed prior to this <br />inspection. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.