Laserfiche WebLink
jj <br /> LAKE 2 " '+ I I LAKE 3 <br /> \ I I <br /> 8'x5'BORE PIT C�f <br /> 8'x5'BORE PIT <br /> 5+OD 4+80 4+ 4+00 3+60 3+20 2+80 � ., 2+40 2+00 1+60 1+20 0+80 0+40 0+00 <br /> N: 1214262.701 — --� — — — — — — — — — — <br /> E: 3173077.54 <br /> 39. Q z <br /> 3173309.30 <br /> 17 <br /> 1 \ I E: 317330309.30 <br /> STA 4+33.24 30 <br /> \\\\Y\\\7 PROPOSED 24' W <br /> = HOPE BORE PIPE STA = 0+32.11 O <br /> mW m <br /> I I NZZO z <br /> gCCD <br /> z�� c <br /> I I °m <br /> QZz <br /> I I <br /> I I <br /> �DRAFT B32 —m"I--w-um-w-um Lu v <br /> NOT FOR BORE DESIGN 20 10 0 20 40 60 g W <br /> CONSTRUCTION <br /> SW N FED / Q <br /> Y z <br /> W <br /> Lu <br /> Bozo /---- -- ---- - - --- Bozo Ct O <br /> / LAKE 3 DESIGN WSEL: 5019 0 d <br /> �... G 0 <br /> \ 0 W <br /> 5015 LAKE 2 DESIGN WSEL: 5015 / \ 5015 cc <br /> 5010 5010 r� <br /> APPROXIMATE LOCATION <br /> �/-OF EXISTING CLAY LINER BORE PIT TO BE BACKFILLED WITH CONCRETE _ <br /> / \ AND WILL SERVE AS A BULKHEAD.UPSTREAM <br /> END OF BULKHEAD WILL BE USED AS INLET O <br /> HEADWALLFORM a <br /> 5005 5005 <br /> w _ ' <br /> OF <br /> cv <br /> 5000 // APPROXIMATE LOCATION STA 0+31 28 BULKHEAD ELEV: 4991.00 5000 O <br /> OF EXISTING CLAY LINER \ N <br /> o > <br /> EXTEND PIPE TO ABOVE J y W o <br /> GRADE AND CAP TOP WITH ¢ o <br /> EDGE OF BULKHEAD / - \ DOMED CAP FORF TU _ <br /> 4995 EXTEND PIPE TO ABOVE STA 4+33.24 FUSION CAP FOR FUTURE 4995 <br /> INCORPORATION INTO % <br /> GRADE AND CAP TOP WITH ELEV: 4986.44 J <br /> INTERCONNECT <br /> DOMED HOPE ELECTRO <br /> FUSION CAP FOR FUTURE BEDROCK SURFACE CONCRETE BULKHEAD TO BE INFRASTRUCTURE a`� <br /> INCORPORATION INTO -- w <br /> INTERCONNECT <br /> FROM GEOTECHNICAL EXTENDED AS NECESSARY TO Z <br /> 4990 INFRA6TRUCTURE i BORE HOLE POINTS - ACHIEVE 8"(MIN.)AROUND o <br /> BORE PIT TO BE BACKFILLED 4990 n vl <br /> WITH CONCRETE AND WILL ANNULAR SPACE OF BORE. c� <br /> SERVE AS A BULKHEAD. EXACT DEPTHS TO BE w O <br /> _————— DOWNSTREAM END OF DETERMINED IN THE FIELD BACKFILL AS NECESSARY 6 <br /> BULKHEAD WILL BE USED AS AROUND BULKH TH Z <br /> OUTLET HEADWALL FORM '_EXISTING OOMlfI'S4� ERIAL iro 19 DEC706 j <br /> 4985 -- <br /> BACKFILLASNECES6ARY 4985 Ll . y <br /> ���,�eA.A s <br /> _ � KEY-� f'r��� t go. TLS <br /> TsslaJ <br /> AROUND BULKHEAD WITH KEY APPROXIMATE s..k 1'=20'H 1 = 5'V <br /> EXISTING ON-SITE MATERIAL BEDROCK LINE <br /> 4980 CONCRXTENDETEBULKHEAD TOESSARY BE C. 1. 4980 <br /> EXTENDED AS NECESSARY TO 10' OR J K` <br /> ACHIEVE 6"(MIN.)AROUND 10' OR MORE \ �,[A\`O <br /> ANNULAR SPACE OF BORE. MORE J <br /> EXACT DEPTHS TO BE <br /> DETERMINED IN THE FIELD s`(�j GV C� 44 <br /> 4975 PIPEa.HOPE ��P �.lp`� 4975 3 <br /> 1 E <br /> NOTE <br /> CONTRACTOR TO LEAVE TOP OF BULKHEADS s <br /> EXPOSED ONCE COMPLETE.GRADING TO BE <br /> 4970 ADJUSTED AS DIRECTED BY ENGINEER IN FIELD. SMxt. <br /> 4970 <br /> a a a a a a a a a a a a a a e a a <br />