Laserfiche WebLink
2' 1 z' 4' 4'—+{ <br /> TRASHRACK <br /> 24" DIA. PIPE Fill 7000 SERIES OIL SEAL <br /> u dv <br /> 1.5" DIA. GATE STEM AND 2.5" <br /> HYDRO GATE 24"x24" DAA. ENCASEMENT PIPE ASSEMBLY <br /> EXISTING GROUND AND SLIDE GATE, SERIEStE <br /> TOP OF BASIN (SEE SH <br /> AROUND PERIMETER 4" DIA.VENT PIPE U <br /> J <br /> GATE THIMB (2) #5 HOOP �„� <br /> 1'-6" � MATCH (BY GATE MANUFACTURE AROUND ALL <br /> 4'f EXISTING (MIN.) 4' <br /> OPENINGS L' 'A <br /> CONCRETE HEADWALL I 12•* 1'3 3 N.) HOPE PIPE a <br /> #4012'O.C.E.W., EACH FACE IF=-• __ IX. GROUND EACH FACE (TYP24'DIA.#5 HOOP AROUND PIPE 3,1} ___ ____ 4 O 12"0.0.E.W 1j'(MIN.) CLEAR COVER ON 10 (TYALL REBARMIN.)CAST-IN-PLACE0•CONCRETE VAULT (MIN.) <br /> NOTES: UNDISTURBED NATIVE O.C. (4 UA <br /> 1. RIPRAP SOIL SHALL BE A UNIFORM MIXTURE: NOTE: TRIM BORE PIPE TO <br /> MATERIAL OR PREPARED TYP.) Q Z <br /> 35X TYPE ON-SITE <br /> RIPRAP SUBGRADE 1i" (MIN.) CLEAR COVER ON MATCH CONCRETE <br /> 35X ON-SITE SOIL MATERIAL ALL REBAR. ----- --� LL <br /> 7_1Cc H J V <br /> 2. TYPE 'L' RIPRAP SHALL BE COOT TABLE O V a D <br /> 506-2E. D-9 INCH RIPRAP --- -� m LU z <br /> CAST-IN-PLACE 3"O.C. __ Z O Q J <br /> 4. CONCRETE VAULT UJI <br /> HYDRO GATE 24'x24' ( ) Y O LL F <br /> SLIDE GATE. SERIES HG580 -_� Q V V Z W <br /> 24'DIA. PIPE 3'-9' TRASHRACKHDPE PIPE (-8) STIFFENER R00 ~~ Z24' DIA. MIN WELDED TO}'xt" BARS Q <br /> 2' W__I 4. O 02• __..._-----__._.__.. _. m— }"xt'8AR (TYP.) MOUNTING PLATE <br /> f— 4' FRESNO 7000 SERIES OIL SEAL 1.5" DA. GATE <br /> STEM AND 2.5" DIA. ENCASEMENT PIPE ASSEMBLY <br /> CONCRETE Lu V <br /> HEADWALL <br /> ENERGY DISSIPATION POOL <br /> NOTE: <br /> WARP FINAL GRADE TO PROVIDE TYPICAL STRUCTURE SHOWN. SEE SHEETS 8 AND 9 FOR SPECIFIC <br /> SMOOTH TRANSITION DIMENSIONS OF EACH STRUCTURE. J 0 --- <br /> TYPICAL OUTFALL HEADWALL STRUCTURE TYPICAL INLET STRUCTURE REINFORCEMENT DETAIL TYPICAL INLET STRUCTURE TRASHRACK <br /> SCALE I" = 3' SCALE 1 = 4' SCALE 1" = 2 W I•". �7 y <br /> V dC <br /> G <br /> O <br /> 0 � <br /> Lu <br /> EXISTING 2- O L <br /> PROPOSED GRADE�\ #5 VERT. �. <br /> GRADE ---- (8 TOTAL) 4'-0" <br /> 2' 0' N:�V 2-6" #4 TIES 2.- 1._0. <br /> (MIN.) � (8 TOTAL) - <br /> NOTE: <br /> REBAR IS TO BE 2'-6"x9'NOTCH 3 <br /> S-0' CONTINUOUS ACROSS IN GRADE BEAM a <br /> (MIN.) SECTION B EXPANSION JOINTS. N 8 <br /> o € <br /> MATERIAL EXCAVATED FROM THE DRAINAGE CHANNEL OR NOTE: ,—1'-6" 2'-6" 4'-6"� pw N <br /> ENERGY BASINS SHALL BE PLACED IN THE BOTTOM OF 1— Z <br /> THE LAKES AWAY FROM THE STRUCTURES AS DIRECTED MOUNT STAFF GAUGE TO 10P ti,.�A '' O s <br /> BY THE OWNER AND ENGINEER. OF GRADE BEAM, ATTACHcy <br /> W/EXPANSION ANCHORS a �? _ � o <br /> GALV. STEEL VENT PIPE 1'-0" 1,• x <br /> APPROXIMATE DRAINAGE CHANNEL CROSS-SECTION I <br /> SCALE 1" = 2' I 2}" DIA. GALV EDGE OF TOOTER (? 2 y <br /> #4012" STEM CASING PLAN VIEW J�N E <br /> �� 6 <br /> 11`" 1'-9' 4"SCH 40 PVC 1•_0• 4"SLEEVE ,(:(•��' \i F g <br /> CEN VENT PIPE COMPACTED BACKFILL ALONG SIDES OF GRADE (MIN.) ADJUST ANGLE OF NeQNT -• f < <br /> TO FACE TO BE .ERPENbICULAR ;;••��C H g <br /> 3'-3" CEN BEAM TO HALFWAY UP HEIGHT OF BEAM (MIN.), (2)#6x3'-O' 3-#5 TO GATES :v" <br /> 2•-6• 4HaV SLOPE AWAY(MIN.) FROM STRUCTURE TOP AND BOTTOM i <br /> PVC PIPE FROM INLET OIL SEAL Z <br /> STRUCTURE. FILL OIL <br /> TRANSITION TO GALV. °�` 19 DEC 17 <br /> STEEL PIPE NEAR VERTICAL. IL CAP x6 xo: 706 <br /> STRAP TO STRUCTURE p,.ox, LD .� <br /> 30" DW BORE HOLE <br /> 4" DAA.VENT PIPE #5 EF P <br /> NOTE: ( HT.) 7'-2' s=r�1"=20'H 1'=SY E <br /> 24" DIA HOPE PIPE MAXIMUM CONSTRUCTION 8-#5 8'MINIMUM COMPACTED 24 <br /> 'DIA. FULL STEM PIPE TOP OF DAM <br /> JOINT SPACING 30'-0' SUBGRADE UNDER BEAM If <br /> 3'ANNULAR SPACE GRADE If <br /> TO BE FILLED WITH BEAM 8 <br /> BENTONITE SLURRY (4) #5 REBAR, FULL HEIGHT <br /> FOR ENTIRE LENGTH EXTEND 2'-6- (MIN.) INTO 2-#Sx� S <br /> OF BORE 4-6" GRADE BEAM 6' '.--�"'� II EF 10' 2'-6" <br /> 1'-0'DIA. x 4'-6' (MIN.) 3-#5R11➢• 8-#4 TIES <br /> PIER(s) 0 1OFT O.C. 1_g fir. EF g_ <br /> 2'-3' <br /> TYPICAL BORE CROSS-SECTION \ #EW T&B I1 shnal <br /> NOT TO SCALE LH 3'-3" COUPLING <br /> ^t1"y 9" Tz'- DRAFT <br /> SECTION C NOTE \ 1-0• �-"1 NOT FOR 1 O <br /> TYPICAL STRUCTURE SHOWN. SEE ,�/ \ SECTION A 4-°" <br /> SHEETS 8 AND 9 FOR SPECIFIC Y/ GATE OPERATOR CONSTRUCTION '. <br /> DIMENSIONS OF EACH STRUCTURE. 8 <br /> SCALE I" = 2' oT. <br />