My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-24_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2018-01-24_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 1:41:30 PM
Creation date
1/25/2018 12:24:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/24/2018
Doc Name Note
Final Drawings
Doc Name
Final Drawings
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR28
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Facility Certification <br />Henderson Mine — Permit No. M-1977-342 <br />Ute Park Extraction Wellfield Project —Phase III <br />The Ute Park Extraction Wellfield Project --Phase III was approved as Technical Revision No. <br />28 to Mine Permit No. M-1977-342 on June 14, 2417. This project is located at Climax <br />Molybdenum Company's Henderson Mill in Grand County. The project involved the <br />construction of two extraction wells and support infrastructure, including a pipeline, vaults, <br />electrical power line, and instrumentation at a location downgradient from 1 Dam at the Mill. <br />The undersigned was responsible for the design of the pipeline and measurement vaults. <br />Henderson Mill personnel have substantially completed the construction of the project and it <br />has been tested and determined to be functional. Record Drawings of the project are <br />attached. Also attached is a memorandum dated October 3151, 2017, describing the results <br />of the hydrostatic pressure test of the discharge pipelines. <br />Pursuant to Rule 7.3.2, the Professional Engineer that has signed and sealed below certifies <br />that the project was completed in general conformance with the approved design as submitted <br />to the Division of Reclamation, Mining, and Safety. This statement is based in part on <br />information that has been provided by others. <br />0•Q' w <br />December 21, 2017 <br />DouglL.; <br />ren <br />W. W.d s, Inc. <br />t
The URL can be used to link to this page
Your browser does not support the video tag.