My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-24_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-01-24_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 10:35:13 AM
Creation date
1/24/2018 9:45:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/24/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
778
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
148 <br />149 <br />150 <br />151 <br />152 <br />153 <br />154 <br />155 <br />156 <br />158 <br />159 <br />160 <br />161 <br />162 <br />163 <br />164 <br />165 <br />166 <br />167 <br />168 <br />169 <br />170 <br />171 <br />172 <br />173 <br />174 <br />175 <br />176 <br />177 <br />178 <br />179 <br />180 <br />181 <br />182 <br />183 <br />184 <br />185 <br />186 <br />187 <br />188 <br />189 <br />190 <br />191 <br />Remove and Regrade Six Post -Mining Stock <br />Ponds <br />EXCAVATE <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />52.66 <br />Haul Topsoil from Pile l0A to East Pit <br />TRUCKI <br />2.66 <br />Haul Topsoil from Pile 16A to East Pit <br />TRUCKI <br />30.44 <br />Haul Topsoil from Pile 4A to West Pit <br />TRUCKI <br />16.79 <br />Haul Topsoil from Pile 15B to West Pit <br />TRUCKI <br />53.93 <br />Haul Topsoil from Pile 15K to West Pit <br />TRUCKI <br />9.05 <br />Haul Topsoil from Pile 16A to West Pit <br />TRUCKI <br />12.68 <br />Haul Topsoil from Pile 16E to West Pit <br />TRUCKI <br />4.52 <br />Haul Topsoil from Windrow 5 to West Pit <br />TRUCKI <br />4.93 <br />Haul Topsoil from Stockpile 16E to South Taylor <br />Pit <br />TRUCKI <br />103.95 <br />Haul Topsoil from New Stockpile South Taylor Pit <br />TRUCKI <br />12.29 <br />Haul Topsoil from Stockpile 15A to Facilities Area <br />TRUCKI <br />18.54 <br />Haul Topsoil from Stockpile 15E to Facilities Area <br />TRUCKI <br />0.41 <br />Haul Topsoil from Stockpile 15F to Facilities Area <br />TRUCKI <br />1.03 <br />Haul Topsoil from Stockpile 15G to Facilities Area <br />TRUCKI <br />3.17 <br />Haul Topsoil from Stockpile 15H to Facilities Area <br />TRUCKI <br />7.06 <br />Haul Topsoil from Stockpile 15I to Facilities Area <br />TRUCKI <br />1.24 <br />Haul Topsoil from Stockpile Gossard Loadout <br />TRUCKI <br />0.33 <br />Replace 48" of Topsoil on Aspen Study Area <br />TRUCKI <br />9.86 <br />Replace 48" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />7.40 <br />Replace 4" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />0.62 <br />Replace Topsoil from Stockpile to Gulch A Pond <br />DOZER <br />14.13 <br />Replace Topsoil from Stockpile to Prospect Pond <br />DOZER <br />9.19 <br />Replace Topsoil from Stockpile to Streeter Pond <br />DOZER <br />14.84 <br />Replace Topsoil from Stockpile to Gossard Loop <br />Pond <br />DOZER <br />1.77 <br />Replace Topsoil from Stockpile to Gossard Pond <br />DOZER <br />5.30 <br />Replace Topsoil from Stockpile to Sewage and <br />Aeration Pond <br />DOZER <br />10.25 <br />Replace Topsoil from Stockpile to Stoker Siding <br />Pond <br />DOZER <br />2.12 <br />Replace Topsoil from Stockpile to Wash Bay Pond <br />DOZER <br />12.72 <br />Replace Topsoil from Stockpile to Wash Bay <br />Sediment Sump <br />DOZER <br />2.47 <br />Replace Topsoil from Stockpile to Work Area <br />Pond <br />DOZER <br />13.43 <br />Replace Topsoil from Stockpile to Section 16 Pond <br />DOZER <br />16.25 <br />Replace Topsoil from Stockpile to East Taylor <br />Pond <br />DOZER <br />6.01 <br />Replace Topsoil from Stockpile to Taylor Pond <br />DOZER <br />1.77 <br />Replace Topsoil from Stockpile to West Pit Pond <br />DOZER <br />10.95 <br />Replace Topsoil from Stockpile to Section 28 Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to Section 21 Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to West Taylor <br />Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to Collection <br />Ditches <br />EXCAVATE <br />679.71 <br />Plug and Seal All Wells and Boreholes <br />BOREHOLE <br />534.00 <br />Seal South Taylor In -Pit Exploration Holes <br />(MR152+MR158) <br />BOREHOLE <br />116.00 <br />Plug and Seal Three South Taylor Pit Exploration <br />Holes <br />BOREHOLE <br />12.00 <br />Plug and Seal 15 Geotechnical Holes <br />BOREHOLE <br />30.00 <br />$7,202.00 <br />$16,359.00 <br />$211,561.00 <br />$116,723.00 <br />$374,837.00 <br />$70,232.00 <br />$88,129.00 <br />$31,446.00 <br />$30,275.00 <br />$806,775.00 <br />$95,349.00 <br />$128,837.00 <br />$2,502.00 <br />$6,347.00 <br />$22,019.00 <br />$43,311.00 <br />$7,595.00 <br />$2,014.00 <br />$68,537.00 <br />$51,400.00 <br />$4,284.00 <br />$3,526.00 <br />$2,292.00 <br />$3,703.00 <br />$441.00 <br />$1,322.00 <br />$2,557.00 <br />$529.00 <br />$3,174.00 <br />$617.00 <br />$3,350.00 <br />$4,055.00 <br />$1,499.00 <br />$441.00 <br />$2,733.00 <br />$2,204.00 <br />$2,204.00 <br />$2,204.00 <br />$92,951.00 <br />$230,552.69 <br />$27,514.02 <br />$3,498.58 <br />$2,035.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.