Laserfiche WebLink
Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />830.60 LCY/hr <br />3322.4 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.584/LCY <br />Total job time: 53.27 Hours <br />Total job cost: $103,346 <br />BULLDOZER WORK <br />Task description: Doze Poly ID D-36 (Map 35A) <br />Site: Colowyo Coal Mine Permit Action: RN7 <br />PROJECT IDENTIFICATION <br />Task #: 023 State: Colorado <br />Date: 1/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: Cat DI IT - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: 1 -shank rinser <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-023 <br />