Laserfiche WebLink
Blade type: 1.000 (PAT) <br />Net correction: 0.9079 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />1,049.17 LCY/hr <br />4196.68 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.462/LCY <br />Total job time: 28.59 Hours <br />Total job cost: $55,468 <br />BULLDOZER WORK <br />Task description: Doze Poly ID D-35 (Map 35A) <br />Site: Colowyo Coal Mine Permit Action: RN7 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 022 <br />Date: 1/16/2018 <br />User: ZTT <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Abbreviation: None <br />Filename: C019-022 <br />