Laserfiche WebLink
Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />0.903 <br />Altitude: <br />0.930 <br />Material Weight: <br />0.894 <br />Blade type: <br />1.000 <br />Net correction: 0.6169 <br />Adjusted unit 1,190.06 LCY/hr <br />production: <br />Adjusted fleet 4760.24 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.408/LCY <br />Total job time: 10.29 Hours <br />Total job cost: $19,968 <br />(AVG.) <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />BULLDOZER WORK <br />Task description: Doze Poly ID D-33 (Map 35A) <br />Site: Colowyo Coal Mine Permit Action: RN7 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />