Laserfiche WebLink
Materials consistency Partly consolidated stockpile 1.1 <br />description: <br />Average push -10% <br />gradient: <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG.) <br />Material consistency: <br />1.100 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.225 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.894 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.8369 <br />Adjusted unit 1,227.98 LCY/hr <br />production: <br />Adjusted fleet 4911.92 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.395/LCY <br />Total job time: 22.80 Hours <br />Total job cost: $44,232 <br />