Laserfiche WebLink
Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 350 feet <br />4 Dozer(s) <br />Unit cost: <br />Unadjusted hourly 915.8 LCY/hr <br />production: <br />93.54 Hours <br />Total job cost: <br />Materials consistency Partly <br />consolidated <br />stockpile 1.1 <br />description: <br />Average push 10% <br />gradient: <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG.) <br />Material consistency: <br />1.100 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.786 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.894 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5370 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />491.78 LCY/hr <br />1967.12 LCY/hr <br />Fleet size: <br />4 Dozer(s) <br />Unit cost: <br />$0.986/LCY <br />Total job time: <br />93.54 Hours <br />Total job cost: <br />$181,450 <br />