Laserfiche WebLink
Initial Volume: 77,000 <br />Swell factor: 1.000 <br />Loose volume: 77,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 250 feet <br />Unadjusted hourly 1,264.9 LCY/hr <br />production: <br />Materials consistency Partly <br />consolidated <br />stockpile 1.1 <br />description: <br />Average push 5% <br />gradient: <br />Average site altitude: 7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG.) <br />Material consistency: <br />1.100 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.903 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.894 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />Net correction: 0.6169 <br />780.32 LCY/hr <br />3121.28 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.621/LCY <br />Total job time: 24.67 Hours <br />Total job cost: $47,855 <br />