Laserfiche WebLink
Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat DI IT - 11U <br />850 <br />Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />$226.13 <br />Utilization % <br />NA <br />$183.90 <br />100 <br />$21.79 <br />NA <br />$11.30 <br />100 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $484.97 <br />Total Fleet Cost/Hour: $1,939.86 <br />MATERIAL QUANTITIES <br />Initial Volume: 151,000 <br />Swell factor: 1.000 <br />Loose volume: 151,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />465 feet <br />698.3 LCY/hr <br />Partly consolidated stockpile 1.1 <br />-15% <br />7,600 feet <br />72 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.900 <br />(AB.AVG.) <br />1.100 <br />CAT HB) <br />1.000 <br />GEN. <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ-OC) <br />1.329 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.894 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.9079 <br />