Laserfiche WebLink
Operator Skill: <br />0.900 <br />Material consistency: <br />1.100 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />0.903 <br />Altitude: <br />0.930 <br />Material Weight: <br />0.894 <br />Blade type: <br />1.000 <br />Net correction: 0.6169 <br />Adjusted unit 1,039.17 LCY/hr <br />production: <br />Adjusted fleet 4156.68 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.467/LCY <br />Total job time: 16.36 Hours <br />Total job cost: $31,735 <br />,. � <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />BULLDOZER WORK <br />Task description: Doze Poly ID D-16 (Map 35A) <br />Site: Colowyo Coal Mine Permit Action: RN7 Permit/Job#: C1981019 <br />