Laserfiche WebLink
Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$57.25 <br />$41.85 <br />NA <br />NA <br />$29.27 <br />$29.27 <br />Unit Subtotals: <br />$308.45 <br />$451.88 <br />$0.00 <br />$0.00 <br />$212.13 <br />$55.33 <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />$308.45 <br />$451.88 <br />$0.00 <br />$0.00 <br />$212.13 <br />$55.33 <br />Total work team cost/hour: $1,027.79 <br />MATERIALS COST <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total Drilling Length: <br />Unadjusted Drilling Rate: <br />Drilling Time: <br />Job Condition Corrections: <br />Site Altitude: <br />Altitude Adjustment: <br />Job Efficiency Factor: <br />Adjusted Drilling Rate: <br />Explosives Prep. Time: <br />JOB TIME AND COST <br />Total Materials Cost: $177,746.64 <br />36,595 <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />7,800 <br />Bulk ANFO nom. density <br />0.90 <br />(DRMS est.) <br />0.67 <br />(CH. Exc. HB) <br />Blasting Agent: <br />7,900-15,000 fps <br />Pound <br />$0.239 <br />376420.236 <br />$89,964.44 <br />Cast primer, 1.0 lb <br />(electric or non -electric <br />Primers or Boosters: <br />system) <br />Each <br />$3.370 <br />650.000 <br />$2,190.50 <br />Non -electric cap, delay <br />Blasting Caps: <br />(non -electrics stems) <br />Each <br />$3.569 <br />650.000 <br />$2,319.85 <br />Detonating cord, 25 <br />Det. Cord, fuse, or <br />gr./ft. (non -electric <br />wire: <br />systems) <br />Linear foot <br />$0.143 <br />56815.000 <br />$8,124.55 <br />MS connectors (non - <br />Delays: <br />electric systems) <br />Each <br />$7.850 <br />655.000 <br />$5,141.75 <br />Stemming, 1.5 in. gravel <br />(inert blasthole packing - <br />Miscellaneous: <br />imported) <br />Cu. yd. <br />$27.808 <br />458.150 <br />$12,740.23 <br />Drill bits: <br />Bit life = 1,750 <br />Linear feet <br />$2,738.47 <br />20.911 <br />$57,265.32 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total Drilling Length: <br />Unadjusted Drilling Rate: <br />Drilling Time: <br />Job Condition Corrections: <br />Site Altitude: <br />Altitude Adjustment: <br />Job Efficiency Factor: <br />Adjusted Drilling Rate: <br />Explosives Prep. Time: <br />JOB TIME AND COST <br />Total Materials Cost: $177,746.64 <br />36,595 <br />linear feet <br />82.00 <br />feet/hour <br />740.10 <br />hours <br />7,800 <br />feet <br />0.90 <br />(DRMS est.) <br />0.67 <br />(CH. Exc. HB) <br />49.45 <br />feet/hour <br />139.05 <br />hours <br />Total Job Time: 879.15 Hours <br />Unit cost: $1.144 per cu. yd. Total Job Cost: $777,656 <br />BULLDOZER WORK <br />